![](https://on.vanmarconstructors.com/wp-content/uploads/2021/09/20015-Upper-West-Side-Condos_Stage-3-Final_Hero_low-res-scaled.jpg)
Project Information
Construction Start: August 2021
Budget: $103 M
Suite Count: 356
Gross Floor Area: 462,000 sf
Gross Livable Area: 281,000 sf
Structure: Cast-in-Place Concrete
Envelope: Window Wall with Precast
Owner: Branthaven Homes
Principles:
- Architect – Kirkor Architects and Planners
- Structural Engineer – Jablonsky, Ast and Partners
- Mechanical & Electrical Engineer – The HIDI Group
- Landscape Architect – NAK Design Strategies
- Interior Designer – II BY IV Design
- Civil Consultant – Urbantech Consulting